Organizing the plan overview of the Takanawa 3-chome Shinagawa Station Front District Type 1 Urban Redevelopment Project. Based on official materials, this article summarizes the mixed-use development in front of Shinagawa Station’s Takanawa Exit, with a total project cost of about 144.5 billion yen, a 30-story above-ground building, and a height of about 155 m, along with its uses, pedestrian space, and relationship to surrounding redevelopments.

Last updated: About 3 min read

The Takanawa 3-chome Shinagawa Station Front District Type 1 Urban Redevelopment Project is a station-front redevelopment under way in front of Shinagawa Station’s Takanawa Exit in Takanawa 3-chome, Minato City, Tokyo. The project area is about 2.2 ha, and its purpose is to reorganize the fragmented land parcels and building stock to create a mixed-use urban district befitting the gateway on the west side of Shinagawa Station. Because the site is immediately adjacent to the station, a key feature of the plan is that it is not limited to renewing a single building, but incorporates the entire station-front space, including plazas, pedestrian passages, and access roads.

The centerpiece of the plan is the high-rise building in Block C-1, which is expected to be a structure with 2 basement levels and 30 above-ground floors, a height of about 155 m, and a total floor area of about 186,900 m². Planned uses include offices, commercial space, MICE, industrial support facilities, housing, and assembly space. Housing is said to total about 50 units, so the project is closer to a mixed-use development with a strong emphasis on business, exchange, and visitor-serving functions than to a predominantly residential project. Tokyo Metropolitan Government approved the establishment of the Takanawa 3-chome Shinagawa Station Front District Urban Redevelopment Association on February 20, 2024, and the schedule has been announced as construction starting in fiscal 2026 and completion in fiscal 2028.

Completion image of the Takanawa 3-chome Shinagawa Station Front District Type 1 Urban Redevelopment Project
Completion image of the Takanawa 3-chome Shinagawa Station Front District (Source: Minato City)

Plan Overview

ItemDetails
Project nameTakanawa 3-chome Shinagawa Station Front District Type 1 Urban Redevelopment Project
LocationTakanawa 3-chome, Minato City, Tokyo (in front of Shinagawa Station Takanawa Exit)
Implementing bodyTakanawa 3-chome Shinagawa Station Front District Urban Redevelopment Association
Project sponsorNot disclosed within the scope of publicly available materials
Participating association membersNot disclosed within the scope of publicly available materials
Project partnersTaisei Corporation, Tokyo Tatemono, Nomura Real Estate, Mitsui Fudosan, Mitsui Fudosan Residential
AreaAbout 2.2 ha
Site areaNot disclosed within the scope of publicly available materials
Total floor areaAbout 186,900 m² (high-rise building in Block C-1)
HeightAbout 155 m
Number of floors2 basement levels, 30 above-ground floors
Main usesOffices, commercial, MICE, industrial support facilities, housing, assembly space
Number of housing unitsAbout 50 units
Urban plan decisionNot disclosed within the scope of publicly available materials
ApprovalAssociation establishment approved on February 20, 2024
Construction startPlanned for fiscal 2026
Planned completionPlanned for fiscal 2028
Project costAbout 144.5 billion yen

Plan Features

The defining characteristic of this project is that it layers business, exchange, stay, and community-use functions onto the limited station-front space in front of Shinagawa Station’s Takanawa Exit. The high-rise building in Block C-1 is planned to include offices, commercial space, MICE, industrial support facilities, and about 50 housing units, making it a combined development that integrates several functions needed at a station front rather than a simple office building or residential tower. The inclusion of MICE and industrial support facilities shows that the plan is intended to accommodate not only everyday workers, but also meetings, exhibitions, visitors, and the activities of nearby businesses.

Pedestrian infrastructure development is another element that defines this plan. Public materials indicate that the deck level will include a plaza of about 5,120 m², a pedestrian-only road with a width of 4.5 to 10 m and a length of about 165 m, an access road with a width of 8 m and a length of about 130 m, and a pedestrian passage at the deck level. In front of Shinagawa Station’s Takanawa Exit, commuting, visits to the area, and hotel-related flows converge, so this kind of space development is as important a planning condition as securing the building volume itself. By securing a plaza immediately outside the station that can handle not only through traffic but also lingering, the plan aims to improve visibility and walkability at the station front.

In addition, Block C-2 will include an assembly space for local exchange, with a total floor area of about 170 m². Compared with the high-rise building that supplies a large amount of retained floor space, incorporating a public-oriented function intended for community use within the block clearly shows the character of a Type 1 urban redevelopment project. Even though the project updates a station-front block of about 2.2 ha, its core lies in handling building uses, plazas, passages, and community exchange functions within a single project.

In this way, the district is positioned not as a standalone redevelopment in front of Shinagawa Station, but as a project that reorganizes urban functions in coordination with the station-front plaza, pedestrian network, and surrounding large-scale developments.

Relationship to Surrounding Projects and Area

The Takanawa 3-chome Shinagawa Station Front District is one of the wider redevelopment projects under way around Shinagawa Station, and it occupies a position near the junction on the west side of the station. On the Takanawa Exit side of Shinagawa Station, multiple flows of people intersect, including Shinkansen services, conventional rail lines, airport access, and nearby hotel use, so the station-front receiving function is directly tied to the quality of block development. The plazas and pedestrian passages being developed in this project are positioned not merely as access improvements to a single building, but as infrastructure that supports circulation throughout the station front.

Nearby, TAKANAWA GATEWAY CITY, led by JR East, is under way, with a grand opening scheduled for spring 2026 following the town opening in March 2025. It is a large-scale plan with a total floor area of about 845,000 m² and a four-block composition, and it is expanding the center of gravity of people flow and urban functions in the Shinagawa-Takanawa area. By contrast, the Takanawa 3-chome Shinagawa Station Front District plays a role in complementing pedestrian networks and urban functions at a point closer to the station front, so the two projects are easier to understand as spatially continuous rather than competing.

Furthermore, redevelopment is progressing in Shinagawa Station West Exit Area A, including the former Shinagawa Goos site, and the mixed-use facility there is scheduled to break ground in May 2025 and complete in 2029, with 29 above-ground floors and a height of about 152 m. As multiple large-scale developments proceed on the east-west and north-south sides of Shinagawa Station, the Takanawa 3-chome Shinagawa Station Front District is positioned as a project that arranges the ground-level environment in front of the Takanawa Exit. If the Shinagawa terminal function of the Linear Chuo Shinkansen and the Tokyo Metro Namboku Line extension concept are realized in the future, even more diverse flows will gather at the station front, making the pedestrian space and mixed-use functions of this project relatively more significant.

INA Short Comment

The Takanawa 3-chome Shinagawa Station Front District is notable not only for the scale of its super high-rise building, but also for the way it updates the plaza, pedestrian circulation, and exchange functions in front of Shinagawa Station’s Takanawa Exit as a unified whole. Compared with the surrounding large projects such as TAKANAWA GATEWAY CITY and Shinagawa Station West Exit Area A, its role in supporting the station-front receiving function becomes easier to read. Looking at the use program together with pedestrian infrastructure is the quickest way to understand this plan.

Sources and References

Daisuke Inazawa, President & CEO of INA&Associates Inc.

Author

President & CEOINA&Associates Inc.

President & CEO of INA&Associates Inc. Leads real estate brokerage, rental leasing, and property management across Greater Tokyo and the Kansai region. Specialises in income-property investment strategy and advisory for ultra-high-net-worth individuals.

Daisuke Inazawa is the President and CEO of INA&Associates Inc., a Japanese real estate firm headquartered in Osaka with a Tokyo branch. He leads the company's three core businesses — real estate sales brokerage, rental leasing, and property management — across the Greater Tokyo Area and the Kansai region.

His areas of expertise include investment strategy for income-generating real estate, profitability optimisation of rental operations, real estate advisory for ultra-high-net-worth individuals (UHNWIs) and institutional investors, and cross-border real estate investment. He provides data-driven, long-horizon advisory to investors in Japan and overseas.

Under the management philosophy "a company's most important asset is its people," he positions INA&Associates as a "people-investment company" and is committed to sustainable corporate-value creation through talent development. He also writes and speaks publicly on leadership and organisational culture in times of change.

He has passed eleven Japanese professional qualification examinations: Licensed Real Estate Broker (Takken), Certified Real Estate Consulting Master, Licensed Condominium Manager, Licensed Building Management Supervisor, Certified Rental Housing Management Professional, Gyōseishoshi Lawyer (administrative scrivener), Certified Personal Information Protection Officer, Class-A Fire Prevention Manager, Certified Auctioned Real Estate Specialist, Certified Condominium Maintenance Engineer, and Licensed Moneylending Operations Supervisor.

  • Licensed Real Estate Broker (Takken)
  • Certified Real Estate Consulting Master
  • Licensed Condominium Manager
  • Licensed Building Management Supervisor
  • Certified Rental Housing Management Professional
  • Gyōseishoshi Lawyer (Administrative Scrivener)
  • Certified Personal Information Protection Officer
  • Class-A Fire Prevention Manager
  • Certified Auctioned Real Estate Specialist
  • Certified Condominium Maintenance Engineer
  • Licensed Moneylending Operations Supervisor